Office 904 - Electrical points

Pick a point type, then click on the plan to place it. Drag a point to move it.

Type
Label
Notes for contractor
Send to the contractor
The share link carries every point, so whoever opens it sees exactly this layout. Your work also autosaves in this browser.
Files
Reset
About this plan
Top-down plan of the locked Office 904 layout (cabins 1-3, wet corridor, toilets, store, pantry, lift lobby, open desks). Grid squares are 1 m. Positions in the schedule are measured from the NW inner corner of the office.